PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Finished setting up the Shear Wall panels at Elev. 4-Stair -2 2nd floor Facing South (800x600).jpg Setting the footing forms at Elev. 7-Stair -4,5 Facing North (800x600).jpg Cleaning around Foundation Walls at Elev. 1,2,3 Facing South-East (800x600).jpg Finished stripping the Foundation wall forms at Monumental Stairs Facing South (800x600).jpg Finished stripping the Foundation wall forms at Monumental Stairs Facing West (800x600).jpg Started unbolting the Shear Wall Panels at Elev. 5-6 2nd Floor Facing South(800x600).jpg
Previous pageNext page Setting the footing forms at Elev. 7-Stair -4,5 Facing North (800x600)
Setting the footing forms at Elev. 7-Stair -4,5 Facing North (800x600)